​On July 11, 2017, CCPE marked a milestone with the “Topping Off Ceremony” for the new CCPE building was an exciting day on campus. As part of a tradition in the construction world, the 'topping off' commemorates the final piece of the structural steel being erected onto the building to complete the structure. The beam was available for everyone to sign, before being raised into place. Attendees included CSULB President Jane Close Conoley; CSULB Provost Brian Jersky; and Dr. Jeet Joshee, Associate Vice President, International Education and Global Engagement and Dean of CCPE.

CCPE-Topping-Off_5.jpgCCPE employees sign their names on the final steel beam.

CCPE-Topping-Off_15.jpg
Employees admiring their autographs and 'Go Beach' messages.
CCPE-Topping-Off_18.jpg
Dr. Joshee adds one final signature to the beam.

CCPE-Topping-Off_27.jpg
Dr. Joshee addresses the attendees at the Topping Off Ceremony.
CCPE-Topping-Off_32.jpg
(L-R): Dr. Joshee, President Jane Close Conoley, and Provost Brian Jersky.CCPE-Topping-Off_33(1).jpg
The final beam is raised into place.
CCPE-Topping-Off_35.jpg
The structure is completed.


As previously announced, the new CCPE building is projected to open in Fall 2018. The three-story, 35,000-square-foot space structure will function as a hub for international students and professional programs, with 20 state-of-the-art classrooms, a conference center, and an external courtyard.


(All photos are credited to: Sean DuFrene / Photographer, Marketing and Communications, California State University, Long Beach)

Filed under Education

Post a comment

(Your comment may need to be approved before it will appear on the site. Thanks for waiting.)
Fields marked with an * are required.